Coffered ceiling crownHigh
Every beam intersection requires a compound miter that accounts for both the spring angle and the rotation angle of the crown profile. Out-of-square beam intersections require angle measurement before any cut is made. No two intersections in a hand-built coffered ceiling are guaranteed to be exactly 90 degrees.
Wainscoting (raised panel)High
Panel width is calculated to divide evenly across the wall length while centering panels on doors and windows. Stile width is adjusted where wall length does not divide cleanly. Individual panel rails are set level, not parallel to the floor in rooms where the floor is not level.
Built-in shelving with face framesMedium-High
Face frame stiles and rails must be square to each other and plumb to the wall. Reveals are consistent on every shelf bay. Adjustable shelf holes drilled at consistent spacing. Finished with paint-grade or stain-grade material to match the existing interior millwork specification.
Solid-core door replacementMedium
Pre-hung solid-core doors require shimming plumb and level in the rough opening. Strike plate alignment is adjusted after the door is shimmed and fastened. Solid-core doors are significantly heavier than hollow-core - the hinges must be the correct size and screw length for the door weight.
Base molding in large-format roomsMedium
Large room base runs require spliced joints that are cut on opposing angles and glued before fastening to prevent seasonal gap opening at the joint. Inside corners are coped, not mitered, in all Eagle custom homes regardless of the corner's apparent square condition.